BRU 0.00% 7.8¢ buru energy limited

Ann: LOI Executed for Canning Basin Drilling Campaign, page-390

  1. 70 Posts.
    lightbulb Created with Sketch. 51
    Hey Yatchy, yep I agree. There are two separate infrastructure installations. The one on the right side of the pad (camp / crib?) and the one in bottom left corner. Top (middle) has been in place for some time with no obvious changes. When I ran the image through some enhancers it didn't do much other than show clear ground surface between the white shapes in bottom left, making me think these long rectangular shapes could be drilling related buildings like the rig office, drill rod store etc. Lets see what appears in next couple days.
 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
(20min delay)
Last
7.8¢
Change
0.000(0.00%)
Mkt cap ! $52.36M
Open High Low Value Volume
8.0¢ 8.0¢ 7.5¢ $32.38K 420.9K

Buyers (Bids)

No. Vol. Price($)
3 81285 7.5¢
 

Sellers (Offers)

Price($) Vol. No.
7.8¢ 107070 1
View Market Depth
Last trade - 16.10pm 16/09/2024 (20 minute delay) ?
BRU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.