I would think that they got first dibs on their allocation, and received it all in the first tranche.
The only other alternative, which would usually happen, is that the two tranches would have been split and the first tranche would have given each participant a proportional amount based on their total allocation.
IF EECP received that same proportion for the upcoming 500M odd, that would put them well above their 10% threshold they’ve been operating within.
all IMO
Cheyne
- Forums
- ASX - By Stock
- NRZ
- Ann: Results of Meeting
Ann: Results of Meeting, page-13
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.724M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NRZ (ASX) Chart |
Day chart unavailable