Besides which - you would really want to drill on the same side of the road as the Walyering production site - not on the other side of the Brand Hwy. Otherwise piping the gas across the highway becomes a major problem for building the pipe to the processing site.
If EP447 "surrounds" Walyering then part of it just may be where the hot spots are.
Add to My Watchlist
What is My Watchlist?