E25 element 25 limited

Ann: $166M DoE Grant Agreement Signed for USA HPMSM Refinery, page-91

  1. 3,867 Posts.
    lightbulb Created with Sketch. 7779
    This graphic from Benchmark is interesting (unsure of original source, I'd taken it from an X feed by OSX - OrestocksNews).

    The HPMSM information on this chart doesn't make any sense. I can only presume its pure metal equivalents of HPMSM so a 65kt plant at a >99.9% purity product (of 32% Mn) is being reported as 20.8kt of supply. There's a typo somewhere because 15kt*21 new plants = 315kt but on the graphic 319kt is presented as the existing supply and 90kt as the new supply needed. Either the number of new plants is wrong, or Manganese has been misprinted. Manganese really is the forgotten metal so even Benchmark doesn't have enough visibility of it that a spot check would pick up errors.

    Until LMFP starts making a significant appearance, the primary battery use of HPMSM is in NMC where it is paired with Cobalt in similar proportions. Cobalt has strong growth, so I think Benchmark have made a printing error and transposed the sides for HPMSM and its 90kt existing, 319kt needed. The 319kt needed would be ~1,000kt of HPMSM capacity. The existing supply would be ~280kt of HPMSM. Those have ball-park alignment with other figures I've seen.

    https://hotcopper.com.au/data/attachments/6762/6762532-6457b55d9bfb8be4dc2efc47e91a1375.jpg
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
25.5¢
Change
-0.010(3.77%)
Mkt cap ! $58.29M
Open High Low Value Volume
26.5¢ 26.5¢ 25.0¢ $48.81K 192.7K

Buyers (Bids)

No. Vol. Price($)
1 7372 25.5¢
 

Sellers (Offers)

Price($) Vol. No.
26.5¢ 21119 2
View Market Depth
Last trade - 15.08pm 31/07/2025 (20 minute delay) ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.