daytrades jan 27 pre-market, page-19

  1. 4,658 Posts.
    lightbulb Created with Sketch. 35
    mii

    In total 13 diamond holes were drilled as part of the extensional drill program, with the objective of
    extending the currently defined Cadjebut Splay JORC Inferred Mineral Resource (1.1Mt @ 2.4% Zn,
    8.4% Pb and 15.7g/t Ag, above a combined 3% zinc plus lead cut-off) further to the east. The
    results announced today and the results announced on 20 December, 2010 show that the high grade
    Cadjebut Splay lead-zinc mineralisation extends a further 550m along the Cadjebut Splay Fault to
    the east.

    A FURTHER 550 METRES OF HIGH GRADES
  2. This thread is closed.

    You may not reply to this discussion at this time.

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.