In addition, QMC has estimated that mineralised potential for the southwest extension to
the Mid Lode within ML 90099 is:
100,000 to 150,000 tonnes at 0.5-1.5% Cu, 1.5-2.5g/t Ag, 100-200ppm Co
Further target mineralisation for the southwest extension of the West Lode within ML 7512
and ML90099 is estimated as:
200,000 to 400,000 tonnes at 0.8-1.4% Cu
WOW!!!