Remember once the Mt Freda resource upgrade is announced shortly,it's game on.In all aspects,production,joint ventures etc.This will be the final piece of the start of the big picture.
Part what were here for:
Mt Freda Gold Mine:QMC will begin PRODUCTION upon completion of the metallurgical recovery test and economic scoping study.
The project consists of two granted mining leases over an area of 120ha.
Mineralisation:
The mine contains a high-grade zone of mineralisation along a 350m-long strike length. Located at a depth of 150m, the zone remains OPEN to the east and west along strike and at DEPTH. It hosts ore bodies that contain copper and cobalt.
Estimated reserves:Over 100,000oz of gold.
The mine also hosts 150,000t of low grade and previously mined ores at its surface. A recently purchased crushing plant will be erected on site to treat the stockpiled ore.
Add to My Watchlist
What is My Watchlist?