~250 b/d ? heavy-crude ... door to ~0.010 maybe wide-open ... or, page-200

  1. 4,949 Posts.
    lightbulb Created with Sketch. 907

    ... so may the acid-job have worked ? [in the most basic way of posting]

    ... well-response ?
    ... pre acid-job - ~294 b/d.
    ... post acid-job - ~260b/d.

    ... which number is higher everyone ? anyone want a gold star ... have a guess ...

    ... gas-shows ?... water [F] ? ... flow to surface ?

    ... the well may not have even unloaded completion brine !! with maybe larger interval [perfs] & x2 acid-stims?

    ... looks to be now open to production on maybe art-lift [PCP] ...

    ... A-3 drilled & completed [?] - no immediate stimulation operations ? what may that say.

    'ASX ANNOUNCEMENT
    15 April 2025
    Block 9 Operations Update
    LR 5.30 (j)PCP was run to lift the heavy brine and additional acid pumped. During
    the pumping cleanup period, a total of 323 Barrels of completion fluid were
    recovered. After cleanup, the well was tested on a fixed pump speed for 12
    hours with an average rate of 488 BOPD and 7 BPD of completion brine.
    Whilst running the MPLT survey, the well was flowed at an average rate of
    260 BOPD
    through a 32/64” choke for a period of 21 hours. The survey
    confirmed that a pump was required
    to lift the heavy completion brine.


    LR 5.30 (k) The peak flow rate of 4,167 BPD of total fluid was recorded over a 15
    minute period at a flowing tubing pressure of 56 PSI.
    The average well test flow rate of 488 BOPD was recorded over 12 hours at
    a flowing tubing pressure of 7 PSI.

    LR 5.30 (m) During the cleanup flow, the presence of CO2 (a byproduct of the dissolution
    of the Carbonate formation by the hydrochloric acid injected into the well)
    was noted. No other non-hydrocarbon gasses were recorded during testing


    The well was then shut in for 12 hours and
    flow tested at a constant pump rate for 12 hours resulting in an average 488 BOPD plus 7 BPD
    of water (completion brine) before shutting in and commencing rig-down of the service rig.
    Remedial acid stimulations, such as these, are optimally conducted with the benefit of a coiled tubing unit (CTU),
    both to direct acid and then to unload a well using gaseous nitrogen." [part-of]

    ... CTU ? ... to be clear, as of this post I've never contacted Melbana in any-way and if Melbana may have been receiving requests on CTU / N2 / MPD /ACID / ART-LIFT etc which I may have been posting about on these threads for ~18 months, and as some posters clearly may copy my posts on here, they may also try to look smart by hounding the company with their 'copy and paste' on CTU etc ...

    ... at the end of the day who cares as long as the market may like it ... I hope everyone makes bank on MAY.

    ... but on this A-2 work-over result, may the last ASX session be considered extraordinary ?!

    ... MAY - work-over complete - rig-released - have been performing extremely well operationally imo ...
    Last edited by Linebacker11: 15/04/25
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.3¢ 2.3¢ 2.2¢ $39.98K 1.759M

Buyers (Bids)

No. Vol. Price($)
11 3120380 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 207741 5
View Market Depth
Last trade - 16.10pm 20/06/2025 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.