SYA sayona mining limited

Ann: Moblan Drilling Results, page-26

  1. 1,690 Posts.
    lightbulb Created with Sketch. 667

    Moblan is being developed as a conventional open-pit operation, and these drill results are almost entirely targeting material that would be mined from a pit. Here’s why:

    1. 2024 Pit Shell Context
      • Sayona’s 2024 Mineral Resource pit shell defines the ultimate pit footprint (in plan and depth) for open-pit mining.
      • All of the “In-pit conversion” intercepts you listed (e.g. 63.3 m @ 1.49 % Li₂O from 51.15 m; 48.8 m @ 1.59 % from 102.4 m; 60.65 m @ 1.87 % from 273.75 m, etc.) lie within that shell, so they’re squarely within the zone slated for open-pit extraction.

    2. Depths Are Within Reasonable Pit Limits
      • Modern hard-rock pits frequently extend to 250–300 m vertical depth (and occasionally deeper if grades justify it).
      • Deepest highlighted intercept—82.8 m @ 1.35 % Li₂O from 277.3 m (SYN-24-0810)—sits right at the usual practical limit for a large open-pit (§), meaning it can be included by deepening the pit walls.
      • Shallower intercepts (e.g. 43–63 m thick at 100–130 m depth) are very comfortably in the “open-pit zone.”

    3. “Outside Pit Shell” Intercepts Signal Expansion, Not Underground
      • The Main, South, Inter and Moleon area intercepts (all outside the 2024 shell) simply lie beyond the currently drawn pit limits.
      • Rather than indicating a switch to underground mining, they point to potential open-pit expansions—i.e. the pit walls would be pushed out (and possibly deepened) to capture these new, high-grade zones.

    4. Geometry Favors Open-Pit
      • Sub-horizontal pegmatite dykes with true widths of 40–80 m are highly amenable to bench mining from a pit.
      • Continuity and thickness are exactly the characteristics you want in a surface/open-pit scenario: you can drill-and-blast large, uniform benches rather than high-cost, narrow underground stopes.

    Bottom line:
    Sayona’s Moblan deposit is being advanced as an open-pit mine. All in-pit intercepts validate and potentially deepen that pit, and the new “outside shell” results simply define areas for pit expansion—no underground development is required or planned at this stage.

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.4¢
Change
-0.001(6.67%)
Mkt cap ! $161.6M
Open High Low Value Volume
1.4¢ 1.6¢ 1.4¢ $879.8K 60.03M

Buyers (Bids)

No. Vol. Price($)
136 32909697 1.4¢
 

Sellers (Offers)

Price($) Vol. No.
1.5¢ 3534506 14
View Market Depth
Last trade - 16.10pm 25/06/2025 (20 minute delay) ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.