From the release;
"Drilling has commenced at well 271-KA03PT10 in Brakfontein, the third of the five production test wells in Kinetiko’s production test program
• Incorporates revised drilling procedures from Oilfield Technologies optimisation studies to enhance gas recovery
• Studies simulating down-hole conditions in the laboratory confirm that circulation fluids under certain circumstances can invade the formation and reduce gas permeability by up to 85%"
Third time lucky - well done you incompetent idiots - hopefully you will not poison this well by 85%, like the previous two production test wells.
- Forums
- ASX - By Stock
- KKO
- Ann: Third Gas Production Test Well Spudded
KKO
kinetiko energy ltd
Add to My Watchlist
2.63%
!
7.8¢

Ann: Third Gas Production Test Well Spudded, page-2
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
7.8¢ |
Change
0.002(2.63%) |
Mkt cap ! $115.4M |
Open | High | Low | Value | Volume |
7.5¢ | 7.8¢ | 7.5¢ | $7.157K | 93.99K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 106666 | 7.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.8¢ | 21499 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 30000 | 0.071 |
1 | 714 | 0.070 |
1 | 125000 | 0.069 |
1 | 125000 | 0.066 |
1 | 150000 | 0.061 |
Price($) | Vol. | No. |
---|---|---|
0.078 | 21499 | 2 |
0.080 | 100000 | 1 |
0.084 | 27000 | 1 |
0.085 | 62500 | 1 |
0.095 | 33333 | 1 |
Last trade - 15.35pm 25/07/2025 (20 minute delay) ? |
Featured News
KKO (ASX) Chart |
The Watchlist
P.HOTC
HotCopper
Frazer Bourchier, Director, President and CEO
Frazer Bourchier
Director, President and CEO
SPONSORED BY The Market Online