The report is 35 pages, so heres a summary:*Here’s a detailed summary of the Mineral Resources Limited (ASX: MIN) report titled “Onslow Iron Resources and Reserves update” released on 21 May 2025:
Overview
Mineral Resources Limited (MinRes) has significantly upgraded the Mineral Resources and Ore Reserves at the Onslow Iron Project (OIP) in Western Australia's West Pilbara region, a joint venture with the Red Hill Iron Ore JV.
Key Highlights
Metric March 2025 September 2023 % Increase Mineral Resources 744 Mt @ 56.3% Fe 394 Mt +89% - Measured + Indicated 508 Mt @ 56.8% Fe - Inferred 236 Mt @ 55.2% Fe Ore Reserves 359 Mt @ 57.5% Fe 207 Mt @ 58.1% Fe +73%
The resource growth is primarily due to infill drilling, remodelling, and reclassification.
Grades of iron and deleterious elements remained consistent.
Confirms Onslow Iron as a long-life, low-cost project.
Ore Reserve Details (as of 31 March 2025)
Total Ore Reserve: 358.6 Mt @ 57.5% Fe
Proved: 14.8 Mt (in-situ + stockpile)
Probable: 343.7 Mt
Other elements: SiO₂ 5.6%, Al₂O₃ 3.6%, P 0.08%, LOI 7.8%
Based on:
US$85/t Platts 62% Fe price
AUD:USD = 0.70
Mining & Processing Strategy
Mining: Conventional open-pit (Hitachi EX3600 + EH4000 fleet)
Bench height: 8–12m; flitch height: 4m
Ore processing: Dry crushing + screening → fines-only DSO
Wet plant added in FY29 for upgradeable material (e.g., clay-bound ore)
Wet plant yield: 90.5%; Fe upgrade: +1.02%
Product moisture: 8.0%
Ore Loss & Dilution: Handled via SMU model (25x25x4m)
Product Marketing & Sales
Long-term off-take agreement with Baosteel Resources Australia (50–75% of MinRes volume).
Price discounts applied based on Fe grade and impurity levels, verified by actual sales since May 2024.
Life of Mine (LOM) Strategy
LOM plan integrates newer deposits: Cardo Bore East, Upper Cane, and Trinity Bore.
Optimized to:
Lower strip ratios
Extend mine life
Improve product consistency
Wet plant enables deeper extraction and more resource conversion into reserves.
Geological Context
All deposits are Channel Iron Deposits (CID) hosted in palaeochannels of the Hamersley Province.
Geology includes:
Goethitic hard cap
Primary CID ore (~19m thick)
Basal mixed zone (~6m thick)
Deposits include: Ken’s Bore, Upper Cane, Cardo Bore East, Cochrane, Jewel, and Trinity Bore.
Resource Classification
Classification Tonnes (Mt) Fe (%) Measured (in-situ + stockpiles) 17.7 ~56.6 Indicated 490.6 56.8 Inferred 235.5 55.2 Total 743.7 56.3
Reported above a 50% Fe cut-off.
Based on extensive RC and diamond drilling (over 116,000m total).
Competent Persons
Ore Reserves: Guy Davies, Stephanie Raiseborough, Gavin Shaw
Mineral Resources: Ashok Doorgapershad
All are members/fellows of the Australasian Institute of Mining and Metallurgy (AusIMM)
Risks & Approvals
Regulatory approvals (including Mining Proposal, EP Act, EPBC referrals) underway.
Community consultation, especially with Robe River Kuruma (RRK) people, will inform final approvals.
Forward Outlook
Onslow Iron is expected to become one of Australia’s leading iron ore projects.
Strong foundations for long-term production, with robust geological understanding and efficient operations.
*gpt4o
- Forums
- ASX - By Stock
- MIN
- Ann: Onslow Iron Resource and Reserve Update
MIN
mineral resources limited
Add to My Watchlist
0.84%
!
$23.90

Ann: Onslow Iron Resource and Reserve Update, page-3
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
$23.90 |
Change
0.200(0.84%) |
Mkt cap ! $4.696B |
Open | High | Low | Value | Volume |
$24.10 | $24.47 | $22.76 | $80.81M | 3.398M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 7660 | $23.88 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$23.92 | 5177 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 986 | 23.750 |
2 | 368 | 23.700 |
1 | 3024 | 23.650 |
1 | 40 | 23.500 |
1 | 426 | 23.460 |
Price($) | Vol. | No. |
---|---|---|
24.000 | 800 | 1 |
24.290 | 1750 | 1 |
24.390 | 2100 | 1 |
24.450 | 3270 | 1 |
24.480 | 380 | 1 |
Last trade - 16.10pm 13/06/2025 (20 minute delay) ? |
Featured News
MIN (ASX) Chart |