Ok cooled down a bit with a few alcoholic drinks and some time to read past announcements.
Have found a mention in the 2010 Annual report that the first MOU was signed with Lockheed Martin and the second with Marand Precision for the tail fins.
Nothing about a third MOU.
This first LTA was in relation to the first group of parts to be supplied. There are apparently another two groups to go but I couldn't find anything in the report about these groups they are now talking about.
A report that made me chuckle was the report issued on 4/11/2009 which said that the LTA was scheduled for signing in " March next year". March 2010 was a long time ago - how could they be so wrong?
The other thing they said in that release was that the MOU and future LTA was for the supply of 19,325 composite doors and access panels. Precise numbers here but nothing else and unfortunately as time goes on less and less.
Admittedly in that 4 November release there was another comment saying that there were other contracts to supply JSF components under discussion.
Maybe they were the other two groups that they haven't told us about. If so then the number of parts to be supplied would be greater than the number provided.
I hope QHL clear all this up soon.
- Forums
- ASX - By Stock
- QHL
- drifting south
drifting south, page-7
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add QHL (ASX) to my watchlist
(20min delay)
|
|||||
Last
26.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $19.72M |
Open | High | Low | Value | Volume |
26.0¢ | 27.5¢ | 26.0¢ | $9.416K | 34.88K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3843 | 25.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
28.0¢ | 2400 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 3843 | 0.255 |
1 | 22768 | 0.245 |
1 | 10000 | 0.240 |
1 | 4347 | 0.230 |
1 | 2400 | 0.210 |
Price($) | Vol. | No. |
---|---|---|
0.280 | 2400 | 1 |
0.285 | 33297 | 2 |
0.290 | 10000 | 1 |
0.300 | 35083 | 2 |
0.310 | 33000 | 1 |
Last trade - 11.33am 10/10/2024 (20 minute delay) ? |
Featured News
QHL (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online