BCM brazilian critical minerals limited

Ann: Ema Project Update, page-2

  1. 7,683 Posts.
    lightbulb Created with Sketch. 2093

    Great read. Enviro study complete. Locals and senior officials happy. Offtake discussions advancing.

    Meanwhile MEI and VMM are raising vast sums of money that would completely build our whole mine so they can build their pilot plants while our pilot trials are almost complete!

    Permeability almost double what was used in the Scoping Study (0.27 m/day vs to 0.15 m/day). Every chance we could drop our world beating AISC of $6.69/kg even further! (MEI's ASIC more than $12).


    "hydraulic conductivity values that are substantially better than those assumed in the Scoping Study (0.27 m/day vs to 0.15 m/day), with maximum K value of 0.65 m/day7.The K value is a property of the material that describes the ease with which a fluid can move through the pore space of the clay network. K values depend on the degree of saturation and on the density and viscosity of the fluid injected. Sufficient permeability within the mineralised zone is the key criterion for the successful deployment of the ISR mining method."


    https://hotcopper.com.au/data/attachments/7165/7165150-c47a7099137d216c760ca6b5ab0f70cb.jpg
    https://hotcopper.com.au/data/attachments/7165/7165159-7611d3ec88ebdca8eb88b373bfeae69f.jpg
    Last edited by Midnight26: 28/07/25
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.4¢
Change
0.000(0.00%)
Mkt cap ! $17.69M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
10 3035279 1.3¢
 

Sellers (Offers)

Price($) Vol. No.
1.4¢ 1861137 3
View Market Depth
Last trade - 07.05am 08/08/2025 (20 minute delay) ?
BCM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.