    1. Key Milestones Achieved

    Commissioning & First Gold
    • First gold poured on 1 July 2025 — delivered on time and within 9 months of construction starting.
    • Smooth transition from dry commissioning (testing systems) to wet commissioning (actual ore processing).
    • Power station (4.8 MW) completed in May and integrated with both the plant and Andy Well underground.
    Construction Progress
    • All major surface infrastructure delivered or near completion.
    • Underground mining workshop at Andy Well to be completed in July ahead of mine development.
    2. Safety & ESG

    • Zero Lost Time Injuries (LTI) — LTIFR = 0.0.
    • TRIFR at 3.3 — still relatively low for a mining project in early operations.
    • Over 300,000 hours worked during construction without LTI.
    • No significant environmental incidents — a strong ESG record for the quarter.
    3. Operations

    • Open Pit:
      • Ramp-up underway with a third mining fleet mobilised.
      • Two new open pits (Turnberry Central & South) started; first ore from St Anne’s North mined.
      • Ore stockpiles building steadily.
    • Underground:
      • Andy Well mine fully energised, ventilated, and ready for July 2025 development start.
      • Owner-operator mining model established — expected to deliver long-term cost savings.
    4. Growth & Exploration

    • Strong drilling results from Turnberry with standout intercepts:
      • 10m @ 5.20g/t Au (incl. 2m @ 23.23g/t Au)
      • Several 1m high-grade intercepts >10g/t Au.
    • Results extend the Turnberry Central resource up-dip toward surface — likely to extend Stage 1 open pit and add shallow high-grade ounces to near-term production.
    5. Financial Position

    • Cash: $56m at quarter-end.
    • No debt (other than underground mining equipment finance).
    • Capital Spend: $68.6m on Murchison development vs DFS estimate of $45.7m — overrun mainly due to:
      • Accelerating underground mining (brought forward to 2025).
      • Mobilising a third open pit fleet.
      • Building extra infrastructure earlier than planned.
    • Funding: $60m institutional placement completed to:
      • Expand open pit mining.
      • Accelerate drilling.
      • Plan processing expansion beyond 600ktpa.
    6. Corporate

    • Leadership transition — Chris Davidson (ex-Chief Development Officer) now Chief Operating Officer to guide ramp-up into steady-state production.
    7. Strategic Outlook

    • Q3 CY2025:
      • Ramp-up of processing plant.
      • First underground ore from Andy Well.
      • Continued open pit ore delivery.
      • Ongoing exploration to add near-mine ounces.
    • Medium Term:
      • Potential processing capacity expansion.
      • Increased ore blending flexibility from open pit + underground sources.
      • Owner-operator model could drive operating cost reductions.
    8. Risks & Considerations

    • Cost Overruns: Already +$22.9m vs DFS — although justified by accelerated production, investors will watch for ongoing discipline.
    • Ramp-up Risk: Transition from construction to steady-state operations can reveal bottlenecks.
    • Gold Price Sensitivity: No hedging means high exposure to spot gold prices — good for upside, but risky if prices soften.
    • Labour Market: Recruitment largely completed, but maintaining skilled workforce in WA mining market remains a challenge.
    9. Overall Assessment

    This is a highly positive operational and strategic update:
    • Delivered first gold on schedule.
    • Established both open pit and underground mining readiness.
    • Strengthened balance sheet for accelerated growth.
    • Early drilling success suggests scope for organic mine life extensions and grade improvements.
    The market will likely view this as a de-risking milestone — shifting Meeka from developer to producer status with strong near-term growth potential.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
15.5¢
Change
0.020(14.8%)
Mkt cap ! $451.9M
Open High Low Value Volume
14.0¢ 15.5¢ 14.0¢ $3.382M 22.47M

Buyers (Bids)

No. Vol. Price($)
6 2867000 15.0¢
 

Sellers (Offers)

Price($) Vol. No.
15.5¢ 3330045 38
View Market Depth
Last trade - 16.10pm 08/08/2025 (20 minute delay) ?
MEK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.