Going on what Eden have reported, "potentially save approximately 1.6 tonnes of concrete for every 1 kilogram of CNF added". If N50 concrete costs around $500/m3 and concrete is 2.8 tonne/m3, then for every kg of carbon fibre there is a potential concrete saving of $178 (500/2.8). That suggests the carbon fibre can be priced up to $178/kg and be better than break even on the concrete just on the material costs saved, let alone the significant construction gains that have been noted. That looks very viable if Eden is right.
- Forums
- ASX - By Stock
- EDE
- trading halt
trading halt, page-43
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EDE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.001(100%) |
Mkt cap ! $8.216M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $129 | 64.34K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
56 | 130683047 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 13252283 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
56 | 130683047 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 13252283 | 13 |
0.003 | 34879714 | 24 |
0.004 | 6587627 | 6 |
0.005 | 978500 | 3 |
0.006 | 245010 | 2 |
Last trade - 11.51am 15/11/2024 (20 minute delay) ? |
Featured News
EDE (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online