RVINTL, economies of scale, think about it.
Nabeba only needs a short rail spur to the site and then the mine infrastructure. The rest of the rail line to the coast, as well as the the port, are already factored in the $3.4Bn CAPEX figure. Therefore, the only things that need to be added to the CAPEX figure are the rail spur and mine infrastructure at Nabeba, but the company will be able to produce that high level of output.
Add to My Watchlist
What is My Watchlist?