link for oel in the newspaper attached, page-10

  1. 110 Posts.
    I emailed Jaap Poll (md) and asked when will drilling commence in Thrace basin and he replyed "in June".
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.