Does anyone know how long this takes? Thanks.
===================================
This was announced on the 10th. March.
"The current operation is preparing to conduct a production test over the interval 2548m to 2567.5m in
the Irwin River Coal Measures section."
This was announced on the 3rd. March.
"The High Cliff Sandstone was subsequently isolated with a cement plug and a liner set and cemented over the Irwin River Coal Measures. Two zones in the Irwin River Coal Measures will be perforated between the intervals 2548-2553.5 metres and 2558-2567.5 metres. These zones, which were not previously tested by open-hole DST, will then be flow tested for further evaluation of the commercial significance of this new field gas discovery."
===============================
- Forums
- ASX - By Stock
- 5GN
- ** how long does this take **
** how long does this take **
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 5GN (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.5¢ |
Change
0.005(3.33%) |
Mkt cap ! $48.52M |
Open | High | Low | Value | Volume |
15.0¢ | 15.5¢ | 15.0¢ | $21.95K | 145.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 6187190 | 15.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.5¢ | 1707190 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
13 | 6162190 | 0.150 |
4 | 1518638 | 0.145 |
2 | 11080 | 0.140 |
1 | 7407 | 0.135 |
1 | 20000 | 0.130 |
Price($) | Vol. | No. |
---|---|---|
0.155 | 1501152 | 19 |
0.160 | 251237 | 10 |
0.165 | 171845 | 5 |
0.170 | 375000 | 3 |
0.175 | 52258 | 3 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
5GN (ASX) Chart |