H and A - here are a couple of factors that may or may not affect your schedule, timing is everything in the HT analysis.
PH
+ nothing has been said about penalty elements eg U and F etc, how do these change at depth in the current pit? in the underground satellites
+ the layout of the waste dumps, wall instability will cause problems going deeper in the pit, unless it is an underground extension
+ mined grade vs milled grade a gap is opening up here, grade may be a problem?
+ safety performance looks to be drifting up (only an indicator)
C
+ depth may add up to $1 to C1 cost
+ existence of U in an underground environment will mean that the mine will need to be treated as a U mine ie ventilation and other health and hygiene controls
+ is U extractable or just a nuisance as at PH? testing is no doubt underway
None of this is insurmountable, but timing is an issue. I would prefer there was another mature development underway, to cover any slack. Hopefully there is and we don't know about it yet.
- Forums
- ASX - By Stock
- OZL
- big c
big c, page-21
Featured News
Add OZL (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online