Hiring staff for drilling and building rigs. Raising the 10 mill easily (oversubscribed). Moving premises. Suspending test hole indefiniteley. Previous small woodside job. Stating contracts less than a month away. Cheaper drilling and faster than competitors (surely cost saving must talk for some even if new technology).
For mine this all points to the start of something big (I hope).
Micht