For those concerned by the PFS delay should read into.
As management has stated, additional work now will benefit future requirements.
Thanks to Kingscrown from the NKP thread...
http://www.pincock.com/perspectives/Issue57-Feasibility-Study.pdf
"Many times it is the need for additional sampling, including bulk samples, for metallurgical testing that
delays the process."
"Key components in the feasibility study are the mine design, production schedule, a detailed process flow sheet, product recoveries, a detailed plant design, consideration of the environmental issues, detailed capital and operating costs estimates, and an economic
model of the project."