EFS #3 now to commence drilling in Mid-june.
Which means EFS #4 should commence drilling at the end of July.
This means that EFS #3 can be fracced at the scheduled time, but EFS#4 (assuming it was to be fracced immediately after 3) might be delayed a week or two. I could be wrong though.
- Forums
- ASX - By Stock
- TXN
- pre-open after 30 day efs #2 results
pre-open after 30 day efs #2 results, page-2
-
- There are more pages in this discussion • 60 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)