re: Ann: Product'n Guidance for 2011-12 S... Not sure why there was such a strong negative reaction to this news with MML down 5% on open. It all seems in line with previous information and forecasts. Cost of production was expected to be $190 for CY2011 and now its $200 for FY2011/12 so we are looking at maybe $5 increase in cost compared to previous expectation.
Looks way overdone to me. Any thoughts?
- Forums
- ASX - By Stock
- X64
- Ann: Product'n Guidance for 2011-12 Shaft Upg
Ann: Product'n Guidance for 2011-12 Shaft Upg, page-2
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add X64 (ASX) to my watchlist
(20min delay)
|
|||||
Last
57.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $129.8M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
X64 (ASX) Chart |
Day chart unavailable