Have just spent 15 minutes onsite with some very obliging chaps who filled me in with the ponds progress.
As you can see, a third pond is well advanced and a small overflow pond is to be started shortly.
The first lined pond IS ready to go with only the pipe to be connected which can be done any time.
The contractors have had difficulty with the soil/clay being so wet, which has severly delayed work being able to be finished.
It is very claggy, I walked on-site 5"9 and walked out 6"2.
With a bit of luck with the weather, the entire site could be completed this month, however, this doesn't affect plant operation as it could commence using pond 1 anytime.
Cheers.
- Forums
- ASX - By Stock
- VYS
- more ponds
more ponds
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VYS (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.0¢ |
Change
-0.005(0.99%) |
Mkt cap ! $258.7M |
Open | High | Low | Value | Volume |
50.0¢ | 51.0¢ | 49.5¢ | $1.219M | 2.419M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 2200 | 49.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
50.0¢ | 203246 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 2200 | 0.495 |
8 | 72796 | 0.490 |
7 | 148100 | 0.485 |
3 | 27215 | 0.480 |
1 | 2127 | 0.475 |
Price($) | Vol. | No. |
---|---|---|
0.500 | 203246 | 1 |
0.505 | 50000 | 1 |
0.510 | 17374 | 2 |
0.515 | 33599 | 3 |
0.520 | 196692 | 2 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
VYS (ASX) Chart |