SDL 0.00% 0.6¢ sundance resources limited

time to sell?, page-22

  1. 37,911 Posts.
    lightbulb Created with Sketch. 828
    Great post Slats7, comparing SDL with FMG

    SDL: 10 year DSO mine life @ 35mtpa
    SDL: 15 (to 20) year Itabirite mine life @ 35mtpa

    FMG: 50 year mine life at 355mtpa

    FMG have double the mine life and 10 times the potential production capacity

    so FMG should be valued at 20 times the price of SDL

    but FMG market cap is 11 times that of SDL

    FMG has a market cap of $17 billion

    SDL has market cap of $1.5 billion

    total SDL CAPEX will be $8 billion

    at (generous) long term iron ore price of $110/t ($175 per dmtu), project has an 6 year payback

    at current $167/t or $270/t dmtu, project has a 3 year payback

    with Hanlong offering $1.5b for SDL and then having to incur $8 billion in capital costs, their capital payback period on long term price assumptions becomes 7 years for a 25 year project

    if Hanlong offer $1.00 per share, their capital payback period on long term assumptions becomes 8 years for a 25 year project


    if Hanlong offer $1.50 per share, their capital payback period on long term assumptions becomes 9 years for a 25 year project

    but then, long term iron ore at $95/t ($150/dmtu) is not impossible

    this blows out the capital payback periods to at 50 cent, $1 and $1.50 takeover to 9.5, 11 and 12.5 years

    now your dreams are starting to sound expensive

    good luck


  2. This thread is closed.

    You may not reply to this discussion at this time.

 
watchlist Created with Sketch. Add SDL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.