You were correct, Pilko.
Range is pleased to announce that the hole to 700m has been opened up to 17 1/
2" with the 13 3/8" casing successfully cemented to the depth of 700m. The
blowout preventer ("BOP") is currently being fitted after which the rig will
shortly resume drilling with a target total depth of approximately 3,500m
expected to be reached in mid/late September.