glad to see CEO is close to a JORC report.
In Australia, the coal seam thickness is always 2-3m.
I donot know what could be the resource for 60m coal thickness.
maybe billion tonnes?
Any technical suggestions for the JORC?
The hole 1 is from surface, does that mean CEO can start production very quick, just dig and sell the coal from the surface?