Hey Scott, don't forget >
Rig # 61 is scheduled to arrive at the Jumonville location
around October 18th.
SHALLOW LAUREL RIDGE (HUTH)
PROSPECT AT BULLSEYE—JUMONVILLE #4
The Huth Prospect is comprised of the mineral rights down to 11,000 ft which contains the producing zone
at 10,100 ft (the Huth Sand). The Huth Sand has produced over 2.3 million barrels of oil and in excess of
2.5 billion cubic ft of gas.
- Forums
- ASX - By Stock
- GGP
- what would be news tomorrow
what would be news tomorrow, page-4
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)