The Annual Report notes that the program, upon signing of the sale and purchase agreement, includes substantial drilling in addition to geophysics and 'seismic testing'.
The following link indicates the success of S/T in Qld: http://www.tiarocoal.com.au/Downloads/ASX%20Seismic%20Program.pdf
Assuming the 'test' for CEO will be the 60 or and the 40 m seams, and then progress through the Valley, to guide the drilling team to test readings? As a guide, this photo indicates what this testing rig looks like: http://www.shoocockatoo.com/2011/03/this-is-what-a-seismic-testing-truck-looks-like/
If Mark and crew can get one of these units o'er to Mono, I'd be very happy!
Enjoy the rest of the w/e.
Cheers :)
CEO Price at posting:
7.2¢ Sentiment: Buy Disclosure: Held