CND 0.00% 3.0¢ condor energy limited

monday they should start log the vertical well

  1. 71 Posts.
    .. 7 mt per hour = ~168 mt per day . To arrive at 900 mt they have to drill other 383 mt it means - without other delay - that likely sunday afternoon they should stop drilling and cement. Monday morning if the well permits they should start to log it. So by Friday next week they should be able to tll us the result of the log and probably they will be drilling the horizontal leg so also possible update on the "contents" of it.

    good luck to us

    ditomagico
 
watchlist Created with Sketch. Add CND (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.