re: Ann: Paradox Basin Potash Drilling Update... Just how many wells and at what spacings do these guys need to get a Jorc done? Do they include all the data from the old oil wells?
with lots of USA excess rig capacity why aren't they using multiple rigs to get this done faster?
- Forums
- ASX - By Stock
- TRH
- Ann: Paradox Basin Potash Drilling Update - State
Ann: Paradox Basin Potash Drilling Update - State, page-18
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)