Two points I really liked the most
"already identified ways to optimise the project in order to improve the already positive results and findings. The Company and its consultants are in discussions with a number of parties in respect of utilising existing operating coal wash plants and rail sidings located close to De Wittekrans Coal
Project that will remove the need to both develop and fund this coal wash plant and rail siding infrastructure as well as potentially accelerating the permitting process and actual development timetable. This may result in capital cost savings of approx. ZAR468m (approx US$60m)."
and even better!
In addition the Company and its consultants are in discussions with specialist coal processing contractors to complete the construction of the coal wash plant under a BOOM (Build-OwnOperate-Manage) Contract that on a standalone basis will potentially reduce the up-front capital by
approx. ZAR308m (approx US$40m).
Overall an excellent announcement and so much to look forward to with this companies future.
- Forums
- ASX - By Stock
- CCC
- Ann: Penumbra and De Wittekrans update
Ann: Penumbra and De Wittekrans update , page-2
-
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries