ZEO 2.78% 3.7¢ zeotech limited

great start, page-5

  1. 4,127 Posts.
    lightbulb Created with Sketch. 147
    Awesome work Eyeknow - much appreciated.

    Some background
    The overall Rasuhuilca Main and West Zones contain 321,100 tonnes @ 2.15 g/t Au, 185.2 g/t Ag (252g/t Ag Equivalent) at a 75 g/t Ag Equivalent cutoff. Additional potential to expand these resources exists to the west within the Rasuhuilca NorthWest and Rasuhuilca South areas around the 4941m Level.
    Within this Resource a Proven & Probable Reserve (JORC Standard) of 168,700 tonnes @ 3.05 g/t Au, 216 g/t Ag (368 g/t Ag Equivalent) has been defined in the mining plan for the Main Zone.

    This mining plan based upon these reserves alone envisages the blasting of 50,300 tonnes as sub-level and stope development ore and a mere 2,500 tonnes of waste development thanks to the extent of the pre-existing development.

    Metallurgically the mill is expected to return average gold recoveries of ~85% and average silver recoveries of ~65%. The lower silver recovery is believed to be due to certain soluble silver minerals not being recoverable via cyanidation and Merrill-Crowe process fixation.

    Mineral processing will be by a simple Crush – Grind – Classify; Agitated CN- Leach; Solid – Liquid separation and Recovery of Au / Ag via Merrill Crowe Process. Merrill-Crowe concentrates will be sold under contract to a precious metals smelter and refinery in Nazca.

    On the basis of the financial model contained within this report this is expected to require a capital spend of US$ 3,081,934 over a five month period. As a result of this study it is expected that the Rasuhuilca mine will have a net payable recoverable precious metal value per tonne of US$139.39 (at a gold price of US$ 900, silver US$ 14.50) metal prices) with total costs ~ averaging US$ 51.40 per tonne over the life of mine.

    Over life of mine (as planned) the Rasuhuilca project is expected to yield ~15,000 ozs gold and ~1 million ozs of silver.

    The operation is expected to generate after tax profits of US9.17 million and has an IRR of 151.4% and a NPV of US$ 4.94 at an 8% discount rate.
    The operation can produce silver at a net cost of US$ 5.73 per troy ounce or on a full capital depreciated cost of US$ 7.79 per troy ounce.


    Now these figures were based on a Au price of $900 and Ag of $14.50. With prices at double that with the feasibility study already done, we would roughly assume a NPV of $18-20M. Not huge but that ignores any upside exploration.

    http://www.cambmin.co.uk/?i=projects&s=per&p=patakancha&sp=rasuhuilca
 
watchlist Created with Sketch. Add ZEO (ASX) to my watchlist
(20min delay)
Last
3.7¢
Change
0.001(2.78%)
Mkt cap ! $68.58M
Open High Low Value Volume
3.7¢ 3.7¢ 3.6¢ $22.46K 607.8K

Buyers (Bids)

No. Vol. Price($)
5 1432194 3.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.7¢ 595112 2
View Market Depth
Last trade - 16.10pm 01/11/2024 (20 minute delay) ?
ZEO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.