The last Bezzecca update:
The two-well production plan will access a revised 2P reserves estimate of 3 bcf. Combined production rates from the two Bezzecca wells is expected to be about 2 million cubic feet per day
But the second Bezzecca well isn't scheduled to be drilled till 2014 (which means it will happen in 2015)... if we assume the single well production will be 1 mmcf/day, that's not going to get us from $3m pa to $10m pa.
Sant'Alberto is the field I'd like to see come online. That or something coming of one of the oil plays...
- Forums
- ASX - By Stock
- PVE
- 0.7mmcf/day
0.7mmcf/day, page-8
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PVE (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.5¢ |
Change
0.001(2.94%) |
Mkt cap ! $40.56M |
Open | High | Low | Value | Volume |
3.5¢ | 3.5¢ | 3.4¢ | $7.729K | 221.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 42083 | 3.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 99300 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 42083 | 0.034 |
1 | 2200 | 0.033 |
2 | 53125 | 0.032 |
1 | 150000 | 0.030 |
1 | 30000 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 99300 | 1 |
0.037 | 110545 | 1 |
0.041 | 10000 | 1 |
0.044 | 34651 | 1 |
0.045 | 115349 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
PVE (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online