GGE 0.00% 0.4¢ grand gulf energy limited

sonlite report, page-11

  1. 3,469 Posts.
    lightbulb Created with Sketch. 1
    As I read it

    After the First and second build ups of pressure were dealt with, and a "Wash and Ream " and CBU ( check Blowout Unit ??)the well started to Flow . What it was we don't know.
    It was "closed in " and pressured up.
    However
    A Mud Circulation problem much the same as before was dealt with by going back to 9630 and a "Squeeze" with 350 sacks of cement, and then drilling it to 10157.
    Then they TIH (Travelled in Hole) with
    "Ring Gauge and Junk Basket" to tidy up junk.
    See
    http://www.weatherford.com/ECMWEB/groups/web/documents/weatherfordcorp/WFT023748.pdf

    CH$$RS R15
 
watchlist Created with Sketch. Add GGE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.