    Another confusing factor is that the current drilling has stopped at 1891 metres, which is regarded as the FIRST target depth.
    The full target depth when the well was commenced was 2100 metres, so, what is to happen with the remaining 209 metres, i.e. still a long way to go and what is there? Will they still sidetrack westward to get to that final target depth?
    Still MANY questions to be answered and we can only hope that we continue to receive (understandable) updates, and soon.
 