Got a relly working on a union-controlled building site.
If the company gets ONE hour of useful work done by these guys in a day its either a miracle or someone's watch stopped.
Its unbelieveable the stuff that goes down.
GZ
- Forums
- General
- melb rally stretches back to trades hall