Interesting - 123 metres of coil tubing as per 19 January release remaining and now down to 38 metres.
That 123 metres was reported while fishing operations had stopped with the pressure issue.
If the current release is stating well pressure is under control and they have already retrieved 70% of the tubing in quick time - that sounds good.
Of more difficulty will no doubt be getting the milling tool - but at least they are onto it!
- Forums
- ASX - By Stock
- SYN
- fishing operations resume
fishing operations resume, page-2
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries