AS1 5.88% 1.8¢ asara resources limited

waiting for the drill results..., page-3

  1. 15,882 Posts.
    lightbulb Created with Sketch. 2305
    Drilling commenced at Balogo tenement on 9/11/11. The assay results from the first impressive 13 holes was released to the market on Monday the 16th January 2012. So that was about 9 1/2 wks from drill start to first assays and included possible down time over the xmas break!

    It has now been another 7 1/2 wks since the last Balogo assay results. Even with backlogs at the labs i would put money on the next set of assay results being released by early next week IMO!

    A further 47 holes had been completed at 16/1/12 out of 61 total holes that had been completed at that date at Balogo.
 
watchlist Created with Sketch. Add AS1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.