Share
11/03/12
21:50
Share
EER's cash cost by referring to waratah coals operating cost estimate.
here goes;
Table 1.6: Operating Cost Estimate (AUD)
(AUD/Tonne)
Average Mining Cost/ROM Tonne = 13.71
(EER's would be cheaper then this considering it's 2bt all open cut/close to surface)
Raw Coal Handling/ROM Tonne = 0.50
Coal Preparation/ROM Tonne = 2.00
Tailings and Rejects Disposal/ROM Tonne = 0.30
Product Coal Handling/Product Tonne = 0.25
Product Coal Cost Loaded on Rail (FOR) = 16.76
Rail Transport/Product Tonne = 4.54
(waratah's cost 0.01c p/t p/km - EER cost 0.02c p/t p/km x 700km) $14.00
Port Handling - Shiploading/Product Tonne =5.00
Royalties @ 7% of AUD 80 Sell Price = 5.60
Cost per Tonne Loaded (FOB) = $41.36
-