re: Ann: Pre Production Drilling Begins at Wi... So that looks in line with that community rag on the drilling. And represents progress I guess. Also mentions ongoing ground works so at least something has been happening on site. However, it doesn't seem that exciting to me that they're starting to drill another 2000 metres when there's been 52,000 metres drilled at Wilcherry Hill already. I guess grade control drilling is different from exploratory and the "reverse circulation drill rig" is also different? Did grade control drilling have to wait until the bond was paid?
No mention of contractors signed up or much of anything really. That could suggest its gonna be a long ride or there's plenty of news still due pre options expiry depending on you bias I suppose.
- Forums
- ASX - By Stock
- TYX
- Ann: Pre Production Drilling Begins at Wilcherry
Ann: Pre Production Drilling Begins at Wilcherry , page-2
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TYX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.43M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.4¢ | $10.2K | 2.05M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 10338476 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 11216292 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 10338476 | 0.004 |
12 | 7224092 | 0.003 |
8 | 6838897 | 0.002 |
8 | 17588888 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 11216292 | 22 |
0.006 | 4915567 | 9 |
0.007 | 1783500 | 4 |
0.008 | 1372154 | 5 |
0.009 | 18962 | 1 |
Last trade - 12.46pm 08/10/2024 (20 minute delay) ? |
Featured News
TYX (ASX) Chart |