    here's a little bit of a taste , read the last couple lines..

    Solid hit, may be a classic.

    Infill drilling at the Kitumba prospect (Mumbwa project) in Zambia (BTR, 100%) has
    revealed the highest grade intersection to date of 231m @ 4.5% Cu, including 17m
    @ 14.9% Cu (S36_033). Combined with other recent results, it now appears BTR
    has an economic copper project on their hands, as part of a large regional
    tenement package with good potential for other discoveries. Whilst there is still a
    lot of work to do to establish potential mine economics, we believe the recent
    drilling is likely to see an increase to the grade of the resource, though many
    questions still remain. We have upgraded our valuation of BTR and maintain a Buy.

    Mumbwa Project, Zambia (BTR, 100%)
    ? The aim of the A$6m drilling program (now >80% complete) is to revise the
    resource category (potential grade/size increase) and drill test new anomalies
    identified. Assays released to date suggest a significant grade increase in the
    resource is likely. The existing JORC resource of 87mt @ 0.94% Cu (including
    22mt @ 1.73% Cu) at Kitumba may grow towards 100mt @ >1% (1mt
    contained Cu) or ~20mt @ 2.5% in our view. This assumption is high risk.
    ? The deposit appears oxidised to a fair depth (300m) with iron enrichment and
    weathering resulting in some very high (supergene) grades. Distribution of
    copper minerals is not widely understood, but is believed to include chalcocite,
    chalcopyrite, malachite and some native copper. Further drilling to confirm
    previous results is planned, and initial metallurgical testwork is underway. BHP
    held the view the deposit has similar characteristics to Olympic Dam.

    ? We anticipate both open cut (OC) and underground (UG) scenarios will be
    given consideration in scoping and feasibility work.


    we have evaluated two conceptual scenarios, both underground and open
    cut. Both options have significant lead times. A decline over 1km long is
    potentially required for the UG, and a large (>50mt) pre-strip for the OC. The
    capital cost of an UG is likely to be cheaper than OC, however production (at
    2mtpa) would be up to 60ktpa contained copper compared to 100ktpa under
    an 8mtpa OC scenario. In addition, operating cost would be higher (up to
    US$60/t compared to a capital cost of 8mtpa OC project. Under operating licence conditions, BTR need to convert to
    a mining lease by November, 2013. Indicative conceptual mining scenarios are show below:



    Cameo dyor
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
47.5¢
Change
-0.010(2.06%)
Mkt cap ! $275.1M
Open High Low Value Volume
48.0¢ 49.0¢ 46.5¢ $1.218M 2.558M

Buyers (Bids)

No. Vol. Price($)
1 8487 47.0¢
 

Sellers (Offers)

Price($) Vol. No.
47.5¢ 7490 1
View Market Depth
Last trade - 16.10pm 19/09/2025 (20 minute delay) ?
BTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.