gold to rocket - quality mining ideas please, page-28

  1. 940 Posts.
    For anyone interested.

    MSR released DFS today... Reviewed by Snowdens international.


    Average Cash cost: 411$
    Average production: 53000oz/year gold
    IRR: 96%
    Project life: 4.5 years
    Payback period: 10 months
    Capex required: 32m$ (Includes contingency and extras)
    Cash on hand at the moment: 10-12m
    Market cap: 33m
    Roughly net cash flow of 50m$/year (At gold price of 1500$)

    Project life a bit short but they are only considering the oxide materials which is less than 30% of their JORC 1.25m.

    PRU, Macq Bank, Asian lion bought in at 20c recently.
    PRU is an asx 200 goldie...holds 24% of MSR. Their MD is a director and provides technical assistance.


 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.