Katok. Happy Songkran to you, but, it is the celebration of a new year. The trouble is that ICN's new year has been delayed with 855 being drilled in late August instead of June.
No, I really don't think that Beach had anything to do with the delay of the rig and am equally confident that ICN new what was going as they actually provided reasons, whereas Beach's presentation only HID it in their proposed drilling programme.
My question, therefore, why did ICN make the announcement about the delay and not the operator?
What did Beach have to fear by concealing it from the market?
Yes, I'm sticking to the thought that BPT is under FAR more pressure from a T/O that ICN is (at the moment!!).
- Forums
- ASX - By Stock
- ICN
- ensign rig
ensign rig, page-56
Featured News
Add ICN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.608M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ICN (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online