EMH 7.14% 26.0¢ european metals holdings limited

€49 million Grant - CRMA, page-58

  1. 7,603 Posts.
    lightbulb Created with Sketch. 960
    EMH very comfortable about Future and time lines .

    DFS time line known in 2 weeks to a month .

    All changes to DFS are very favorable .

    All new changes to DFS and site will shorten all permitting , build and production time lines .

    Geomet to lease site from CEZ .

    Three block rights ( cost $10 mil ) will be closed out for old idea , one block will remain , expected a return of aprox 10 mil paid capital , to Geomet which was loaned by EMH .

    Restacking tailings will still happen with return rail carts of minimum 35% not sure where the balance 65 % goes , but maybe good road base .

    Just fund 1st hurdle to be announced this month . Will be aproved by JASPER ( don't who this is ) one month later aproval from Regional area , and one month later by Federal Gov , time line to funds in bank July .

    Still looking at Offtake B4 DFS and possibly 2 from EU based Companies . My guess LG and CEZ

    Permits are broken into 2 categories Processing and Mining , Processing is a new application for new site , Mining has been acccepted some time ago , but both need to be applied for at same time and can only officialy be done after DFS but well infront of time curve .

    We tick all boxes to ERBD which we report on monthly basis .

    Both EIB and ERBD will fund project ( probably 75% as i have stated B4 )

    Apparently normal now to get financial assistance with offtake partner .ie some prepaid or equity deal in Geomet .

    Geomet not sure at this stage , what percentage of production will be locked up with a floor and ceiling with offtakes . ( great in my terms )

    Cash flow : EMH have enough til DFS , ie no cap raise until FID . EMH currently have $5 mil in bank .

    Geomet revising budget but expect Just fund in July , so plenty there too , with a property refund as well .

    CEZ not allowed take over at all until construction decision , if dead lock , it goes to independant evaluation .

    Catalysts , Macro , EU just very slow but is happening both EU and in country .

    Micro , What is DFS , what is increased production , KC hinted a five in front of tonnes , thouth he was being conservative , probaly the 60 k tonnes already mentioned in past .

    Be prepared for possible increase of both Capex and opex , our numbers 3 years old .

    it has become normal now for offtakers to provide finance assistance , all Europe will be buying our Lithium .

    Total length of permitting Period only after DFS , CRMA will assist no end .

    Howard , reiterated at very start about broker valuation and particularly Ireland's , are 4 to 6 times current Market Cap ie in the $2 ( two dollars mark ) aud ( one pound above mark ) .

    Very good exciting times in next few months , the new site had been included in current DFS for three months already . A couple of site visits will need to tweak the DFS .
 
watchlist Created with Sketch. Add EMH (ASX) to my watchlist
(20min delay)
Last
26.0¢
Change
-0.020(7.14%)
Mkt cap ! $53.93M
Open High Low Value Volume
28.0¢ 28.0¢ 26.0¢ $7.082K 26.23K

Buyers (Bids)

No. Vol. Price($)
2 10843 27.5¢
 

Sellers (Offers)

Price($) Vol. No.
29.0¢ 16055 2
View Market Depth
Last trade - 15.28pm 22/07/2024 (20 minute delay) ?
EMH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.