RMI 0.00% 2.1¢ resource mining corporation limited

hey trees,-core is to be cut on site, flown to port Moresby then...

  1. 658 Posts.
    hey trees,

    -core is to be cut on site, flown to port Moresby then transported to Lae where prep is to be carried out

    -Assays are to be undertaken in Indonesia

    -First core samples are moved from site very soon.

    no estimates on the turnaround time as it all depends on the time of each step above, will know after this first batch thou.



    hoping to hear from coy about the commissioning of the 2nd rig thou.



    i wonder who has been accumulating too.
 
watchlist Created with Sketch. Add RMI (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.