Still months away from any seismic on A3. Its all about the gas though, not so much the oil for this permit.
All the other projects are in their infancy, and that is compared to EP413 that still needs 3D seismic.
All other projects should be farmed out, as well as operatorship.
concentrate on A3, farm out the rest with clauses for strict deadlines with gaining approvals/drilling etc.
The world was NWE's oyster once upon a time, now we are a 1billion share company that the market doesn't want to know.
- Forums
- ASX - By Stock
- .005 wow
Still months away from any seismic on A3. Its all about the gas...
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla