******Well expected to reach top of C18 carbonate section within days when the well will be logged for
the C12 - C17 sections, then set 9 5/8 inch casing before drilling primary C18/19 carbonate reservoir************
The ann released yesterday states testing of the c12-c17 section prior to casing for c18/19 drilling.
You would hope by Thursday we will know results for upper sections and readiness for further drilling.
Easter bunny is coming
- Forums
- ASX - By Stock
- 1.2 still
******Well expected to reach top of C18 carbonate section within...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
ETR (ASX) Chart |
Day chart unavailable