DSE 0.58% $3.45 dropsuite limited

$1.5 billion gold @ shallow depth, page-2

  1. 7,675 Posts.
    lightbulb Created with Sketch. 21
    Now thats a thread title worthy of discussion
    nice one Pachino
    Not sure about drilling program in 09 taking us all the way to 2m Oz (although at Tennant Creek it is possible)guess it depends on the scope of drill program. My hope is that next drilling will be focused on targets identified by scoping and feasability study as best candidates for commencement of mining.

    Most important in my mind is for next round of drilling to "drill out" target for grade control purposes in preparation for mining. This will add Oz and increase level of confidence in resource. We need some drilling to be done at some point this half IMO to get some momentum happening as a follow on from any announcements regarding scoping and feasability studies and their conclusions
 
watchlist Created with Sketch. Add DSE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.