"The railway is built for 40 tonne axleloads, making it the heaviest haul railway in the world. For comparison, the other Pilbara railways operate with axleloads of 35 tonnes and 37·5 tonnes, while the trans-Australian main line was recently upgraded to operate at just 21 tonnes. "
Puts to bed all the down ramp rumour about the ability of the rail to carry the ores.
- Forums
- ASX - By Stock
- 10.50 monday
"The railway is built for 40 tonne axleloads, making it the...
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
$19.47 |
Change
-0.260(1.32%) |
Mkt cap ! $59.94B |
Open | High | Low | Value | Volume |
$19.65 | $19.65 | $19.37 | $126.0M | 6.462M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1000 | $19.47 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$19.50 | 24291 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 200 | 19.450 |
1 | 400 | 19.430 |
1 | 1500 | 19.420 |
2 | 2700 | 19.410 |
9 | 3664 | 19.400 |
Price($) | Vol. | No. |
---|---|---|
19.500 | 727 | 1 |
19.540 | 399 | 1 |
19.550 | 2368 | 1 |
19.560 | 514 | 1 |
19.580 | 2372 | 3 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
FMG (ASX) Chart |